PREPARATION
19
CABLE MANAGEMENT
For 19/22LD350, 19/22LD350C
After connecting the cables as necessary,
install CABLE HOLDER as shown and bundle
the cables.
Connect the cables as necessary.
To connect additional equipment, see the
EXTERNAL EQUIPMENT SETUP section.
Open the CABLE MANAGEMENT CLIP as
shown.
CABLE MANAGEMENT CLIP
1
2
Put the cables inside the CABLE MANAGEMENT
CLIP and snap it closed.
3
Commenti su questo manuale